Integrated Change Control

Coordination Changes Across the entire project
<–>Communications (Performance Reporting)<——> Integration (I.Change Control)<–>

Subsidiary Change control (scope, Quality, Schedule, Cost, Risk Change Controls, C.Adm)

Scroll to Top